The developer was launching a 240-acre integrated township with 14 residential towers, retail high street, schools and clubhouses. They needed a single signage partner who could deliver pre-launch site hoardings, the sales experience centre and the long-term wayfinding system as one continuous SOW. We delivered all three phases over 22 months.
The earlier signage contractor had gone insolvent mid-project, leaving incomplete hoardings exposed to monsoon and an unfinished sales gallery 5 weeks before launch media day. The developer's legal team also flagged unclear material warranties.
We took over the partial work after a structural audit, replaced sub-spec frames at our cost where required, and re-fabricated the sales gallery cladding in 32 days. The wayfinding system was built around a brand-aligned visual language and approved by the developer's design head before fabrication. All structural elements ship with engineer-stamped load calculations.
Sales gallery delivered 4 days ahead of media launch, with the developer signing off the full handover pack on launch day. The 36-month structural warranty has been claim-free for 20 months. The developer has since awarded us 2 additional projects worth ₹8.6 Cr combined.