Loading…
A tier-1 supplier needed line-side parts in Bengaluru every morning, with e-way bills and PODs that survive an audit.
A dedicated nine-tonne vehicle on a fixed night lane, e-way bills generated pre-dispatch and a signed POD scanned the same day.
Eleven months with zero line stoppages attributed to transport; the lane is now a standing contract.